03.04.2020 / CRANE MODERNIZATION OF A TUKAN MANUFACTURED IN 2000 FOR THE INLAND PORT OF SCHWEDT

The Service Group of Ardelt in Eberswalde has been realized the upgrade from old Siemens MASTERDRIVE-drives to the new and modern Siemens SINAMICS-drives. The technical concept based on the application-design of current new crane deliveries. With that concept of recuperation via the SMART-LINE-Module the crane control not only became more modern but also more green and sustainable.  The braking energy becomes not transferred into heat by resistors, it becomes recuperated to the feeding grid or will be used by drives which are active at the same moment. The project has been fulfilled in schedule, in the shortest possible time and to clients fully satisfaction.



Back to overview